The
Swim [ view map ]
SuperSprint: 375 meters/.23 miles • Sprint: .75 kilometers/.46
miles)
An in-water start with water treading- The Swim is a triangle
course for both SuperSprint (376 meters) and Sprint (750 meters).
The Transition
Area
The transition area is a .1-mile run from the swim finish, slightly
uphill, mostly on grass.
The
Bike [ view
map ]
SuperSprint: 13 kilometers/8 miles • Sprint: 19.5 kilometers/12
miles
The SuperSprint Bike Course requires cyclists to exit
Steel Lake Park, heading east on S. 312th St. to 28th Ave. IMPORTANT:
As the race progresses, 28th Avenue will be shared by bikers and runners.
The 2 bike lanes (north & south) will be on the east side of 28th,
with the runners on the west. The bike and run course will be separated
by cones. Cyclists will proceed north on 28th to S. 304th
St., then head east to Military Rd. Cyclists will travel south on
Military Rd. to S. 320th, then head west to Weyerhaeuser Way. Head
south on Weyerhaeuser Way to S. 336th, turn left on 336th, then go
left around the loop past the Corporate Headquarters, The Pacific
Rim Bonsai Collection, The Rhododendron Botanical Garden and back
to Weyerhaeuser Way. Head north to S. 320 (Turnaround for Sprint distance),
make a right on S. 320, and a left back onto Military Rd. Continue
to S. 304th and make a left, take another left on 28th Ave., a right
on S 312th and another right into the park. The course is rolling
with a long gradual downhill going out and an uphill coming back on
Military.
Sprint Distance
Bike Course requires cyclists do a turnaround just before Weyerhaeuser
intersects S. 320 and repeat the loop inside the Weyerhaeuser campus.
The Sprint distance is just less than 12 miles.
The Run [ view map ]
SuperSprint: 3.4 kilometers/2.1 miles • Sprint:
6.5 kilometers/4 miles
The SuperSprint Run Course exits
the Transition Area north into the park and then at .1 miles climb the
ZZ Trail (steep but short trail) up to 26th Ave. Runners turn left and
then take an immediate right onto 309th St., then an immediate left onto
28th Ave. REMINDER:
28th Avenue will be shared by bikers and runners. The 2 bike lanes (north
& south) will be on the east side of 28th, with the runners on the
west (left side). The bike and run course will be separated by cones. The course goes counter-clockwise around the lake on 28th Ave, to S.
304th St, Pacific Hwy S. and then onto 308th St, where runners re-enter
the park through a gate. There will be directional signs and Course
Marshals to direct runners into the finish chute. The course is rolling,
except for the steep incline of the ZZ Trail. There will be an aid station
at the start and at the one-mile point.
The
Sprint Run Course first lap is the same as SuperSprint,
but at the bottom of the dirt trail, turn left, run across the
promenade above the beach and go up ZZ Trail again to complete
another loop of the course, finishing the same as the SuperSprint
above. There will be an aid station at the one, two and three mile
points.
Note: The course is subject to change and distances are approximate.
A final course description will be available at the mandatory course
talk on Saturday, September 6th.